3. Soon after rig positioning, push the casing into the bottom. Push steel casing to a minimum a depth of 1 m down below the ground amount to consider lateral masses and actions at web page. The steel casing also combat problems resulting from groundwater for the duration of piling. https://cast-in-situ-piles-in-dha27024.blog-ezine.com/32684956/everything-about-cast-in-situ-piles-in-dhaka