The 25mm thick hefty steel tube is driven Along with the finish closed by a metal shoe. On reaching the necessary driving resistance, a full duration cage is lowered in towards the tube and stuffed with higher slump concrete. The tube is then vibrated out leaving a shaft of concrete. https://ellioteczuo.bloggerchest.com/32481479/facts-about-cast-in-situ-piles-revealed